---
id: 9d5c1fbcb7
section: transit
first_reported: 2026-11-11 09:08 EST
updated: 2026-11-11 09:08 EST
status: developing
outlets: 1
---

# Treasure Island seeks to offload its drawbridge

Treasure Island is looking to get rid of its drawbridge, according to a St. Pete Catalyst headline; the article text was not available.

Section: [Transit & Streets](/tampa-bay/section/transit.md) · Entities: none

> Developing: facts are still being established. Treat early details as provisional.

## Coverage

- [St. Pete Catalyst](https://stpetecatalyst.com/treasure-island-wants-to-unload-its-costly-drawbridge/), 2026-11-11 09:08 EST: Treasure Island wants to unload its costly drawbridge

Headline and summary written by the Acta Diurna desk from the coverage above. Read the original reporting for full detail.
