---
id: 750be6177d
section: transit
first_reported: 2026-11-09 19:54 EST
updated: 2026-11-10 00:29 EST
status: reported
outlets: 3
---

# TTC resumes Line 1 and 2 service at Bloor-Yonge

Service resumed at Bloor-Yonge station just before 9 p.m. Monday after an injury at track level, according to the Toronto Transit Commission.

Section: [Transit & Streets](/toronto/section/transit.md) · Entities: [Toronto Transit Commission](/toronto/wiki/toronto-transit-commission.md), [Bloor-Yonge station](/toronto/wiki/bloor-yonge-station.md)

## Coverage

- [CityNews Toronto](https://toronto.citynews.ca/2026/11/09/trains-not-stopping-at-bloor-yonge-no-service-between-college-and-st-clair-on-line-1/), 2026-11-09 19:54 EST: TTC service resumes at Bloor-Yonge station
- [CTV News Toronto](https://www.ctvnews.ca/toronto/article/no-service-on-portion-of-line-1-after-injury-at-track-level-ttc/), 2026-11-10 00:29 EST: Service resumes on Line 1 after previous disruption
- [CP24](https://www.cp24.com/local/toronto/2026/11/10/no-service-on-portion-of-line-1-after-injury-at-track-level-ttc/), 2026-11-10 00:29 EST: Service resumes on Line 1 after previous disruption

Headline and summary written by the Acta Diurna desk from the coverage above. Read the original reporting for full detail.
